This new build sits on a west-facing shoreline, which meant two things from day one: a lot of glass, and materials that could handle wind, sun, and Michigan winters without complaint.
The build
We supplied the framing package, engineered floor system, and the entire window and door order. Staging mattered as much as product — the crew needed lumber on site in the order they were building, not all at once on a tight lot.
- Engineered floor system and framing package
- Andersen windows and patio doors
- Composite decking and cable railing
- Interior trim, doors, and stair parts

"They staged three separate drops so we never had a pile in the way. That's the difference between a good yard and a great one."
Stop by any of our four Central Michigan yards and a member of our staff will walk you through the options, pull real samples, and put together a material list you can build from.